Electrical Installation; Terminal Identification - GE Multilin DGT Series Instruction Manual

Distributed generation trip control system
Table of Contents

Advertisement

ELECTRICAL INSTALLATION

Electrical installation

Terminal identification

2–14
This section describes the connection of external cabling to the DGT-D Assembly. The
figures below show overall views of the connection points for all external cabling and
wiring. Subsequent illustrations show more detailed views of power connections as
required.
Route the power and I/O signal wiring through the weathertight bushing on the bottom of
the enclosure. Do not tighten it until all cabling has been installed. All user connections for
power and signal wiring are made to the terminal block.
Figure 2-2: DGT-U terminal layout
Figure 2-3: DGT-R terminal layout
POWER SUPPLY
POWER SUPPLY
Figure 2-4: DGT-D terminal layout
1 1 2 3 4 5 6 7 8
POWER
I/O
SUPPLY
DGT DISTRIBUTED GENERATION TRIP CONTROL SYSTEM – INSTRUCTION MANUAL
1 1 2 3 4 5 6 7 8 9 10 11 12 13 14
POWER
I/O
SUPPLY
1 2 3
POWER
SUPPLY
CHAPTER 2: INSTALLATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgt-uDgt-rDgt-d

Table of Contents