GE LOGIQ E9 Service Manual page 448

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-6-3
LCD Arm assembly replacement
Three types of LCD Arms Assemblies are covered in this Section. LCD Arm used in R3.x and earlier,
R4.x production and R5.x and later.
For LCD Arm Assembly used with LCD Monitor V2 (LCD and Arm Assembly used in R4.x production),
see:
8-6-3-2 "LCD Monitor V2 Arm assembly replacement (used in R4.x production)" on page
For LCD Arm Assembly used with LCD Monitor V2 (LCD and Arm Assembly used in R5.x and later
production), see:
If the V2 LCD Arm Assembly Adapter is being replaced, see:
replacement - R4.x and later" on page
Manpower /
Time
One person /
15 minutes
Table 8-64
NOTICE
TAG
&
LOCKOUT
Signed
Date
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
NOTE: If you are also replacing the LCD Monitor, you do not need to remove the monitor from the arm.
3. Remove the LCD Monitor assembly and the Bulkhead cover.
Preparation Links (if you need more information):
4-2-3 "Power shut down" on page 4-7
8-6-2 "LCD Monitor assembly replacement" on page 8-88
8-5-21 "Bulkhead Cover replacement" on page 8-84
8 - 102
. 2
EV
8-6-3-3 "LCD Monitor V2 Arm assembly replacement - R5.x and later" on page
Table 8-63
Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
Preparations and Preparation Links
Preparations - you must perform the following steps
Energy Control and Power Lockout for LOGIQ E9
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO
VOLTAGE GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE
ARE NO TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL
ON/OFF BUTTON WILL TURN OFF.
5. DISCONNECT THE EPS (EXTENDED POWER SHUTDOWN) BATTERY AT J3, OR THE
BATTERY FROM THE CHARGEBOARD AT PCN1 WHEN WORKING IN THE BEP. THIS
SHOULD BE DONE WHENEVER THE BEP IS OPEN AND THE EPS OR CHARGEBOARD
IS EXPOSED AND CHANGING PARTS.
Beware that the Main Power Supply, Extended Power Shutdown or ChargeBoard and BEP
may be energized even if the power is turned OFF if the cord is still plugged into the AC
Outlet.
Section 8-6 - Replacing Top Console Parts
8-6-4 "V2 LCD Arm Assembly Adapter
8-118,
Tools
LOGIQ E9 S
M
ERVICE
ANUAL
8-105.
8-111.

Advertisement

Table of Contents
loading

Table of Contents