If A Performance Verification Test Fails - HP E3456A User Manual

Emulation for the powerpc mpc500
Table of Contents

Advertisement

Chapter 6: Solving Problems
Solving Emulation Probe Problems
To execute tests 3, 4, and 5 only for 2 cycles:
pv -t3-5 2
The results on a good system, with the BNCs connected, and with the
loopback test board connected, are as follows:
c>pv 1
Testing: HPE3499B Series Emulation System passed!
Test # 1: Powerup PV Results
Test # 2: LAN 10Base2 Feedback Test
Test # 3: LAN 10BaseT Feedback Test
Test # 4: Break In and Trigger Out BNC Feedback Test
Test # 5: Target Probe Feedback Test
Test # 6: Boundary Scan Master Test
Test # 7: 12C Test
Test # 8: Data Lines Test
PASSED
Number of tests: 1
Copyright (c) Hewlett-Packard Co. 1987
All Rights Reserved.
Reproduction, adaptation, or translation without prior
written permission is prohibited, except as allowed under copyright laws.
HPE3499B Series Emulation System
Version:
A.07.53 01Mar98
Location:
Generics
HPE3459A ARM7 JTAG Emulator
Version:
A.01.01 01Mar98
R>

If a performance verification test fails

There are some things you can do if a failure is found on one of these
tests. Details of the failure can be obtained through using a verbose
level of 2 or more.
TEST 2: LAN 10BASE2 Feedback Test failed
For LAN 10BASE2 test, the following is an example of a failure which is
not caused by a broken emulator.
R>pv -t2 -v2 1
Testing: HPE3499B Series Emulation System
Test # 2: LAN 10Base2 Feedback Test
FAILED - no lan connection (LAN probably not terminated
FAILED
Number of tests: 1
140
passed!
passed!
passed!
passed!
passed!
passed!
passed!
passed!
Number of failures: 0
failed!
Number of failures: 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

16610a

Table of Contents