Transports; Assemble - Bosch TCE 260 Operation Manual

Table of Contents

Advertisement

4.2

Transports

1. Hoist up the machine from the pallet. Bind the hoist
tape (mod.DR 750 of 3 m and DR 735 of 1.5 m factor
6:1 ). Hoist tape requirement: more than 1 metric
ton and safety factor 6:1.
2. No matter when to move the machine, you should
take above methods.
3. You cannot move the machine if the machine is not
cut off from its air supply and power supply.
4.3

Assemble

1. Lifting the cross arm to the machine body. As shown
in figure below:
R
Put the air pipe that inside column into the machine
body.
R
Fixed the position of machine, then put the fixed
axis insert the linked hole by hammer then fasten.
Robert Bosch GmbH
Unpacking | TCE 260 | 9
R
Axis connect the bead breaker cylinder and vertical
column, then fixed.
Note: All above processes must be finish on the pallet,
don't loosen the bolt; and during moving period, please
make the cross arm stable until finish to assemble.
2. Before lifting the complete machine.
en
|
1 987 AT7 374
2015-09-02

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents