Installation Checklist; Contents Of This Chapter; Checklist - ABB ACS880-207 Hardware Manual

Industrial drives, igbt supply units
Hide thumbs Also See for ACS880-207:
Table of Contents

Advertisement

Installation checklist

Installation checklist

Contents of this chapter

This chapter contains a checklist of the mechanical and electrical installation of the drive.

Checklist

Examine the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death,
or damage to the equipment can occur. If you are not a qualified electrical
professional, do not do installation or maintenance work.
WARNING!
Stop the drive and do the steps in section
before you start the work.
Make sure that ...
The ambient operating conditions meet the drive ambient conditions specification, and enclosure rating
(IP code or UL enclosure type).
The supply voltage matches the nominal input voltage of the drive. See the type designation label.
The insulation resistance of the input power cable, motor cable and motor is measured according to
local regulations and the manuals of the drive.
The drive cabinet is attached to the floor, and if necessary due to vibration etc, also by its top to the
wall or roof.
The drive module is fastened properly to the enclosure.
Installation checklist 65
4
Electrical safety precautions (page 46)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents