Hydran* 201i Instruction Manual
CAUTION
9.3.8 Verifying the Operation
Proceed as described in Section 9.2.1 and Section 9.2.2.
9.3.9 Verifying the Analog Outputs
Perform this procedure only if the Hydran 201Ci-1's analog outputs are used (connected
to a SCADA system).
Proceed as described in Section 9.2.3.
9.3.10 Verifying the Alarm Indicators and Alarm Relays
Proceed as described in Section 9.2.4.
9.3.11 Verifying the Supervisory Link Communications
Verify communications between the Hydran 201Ci-1 and the Hydran 201Ti using a host
computer running the Hydran Host software.
Proceed as described in Section 9.2.5.
9.3.12 Conclusion
The installation of the Hydran 201Ci-1 is now completed
MA-033
Rev. 14.0, 12-Nov-18
The earth/ground terminal (terminal 3) must be connected.
Never perform high-voltage tests (mega-ohm measurements
using a Megger* instrument) on cables connected to a Hydran
201Ti or a Hydran 201Ci Controller. Never apply high voltages
to the components of a Hydran 201R Model i, as they are
equipped with surge protection devices that could be damaged
by Megger* tests.
Page 141