Huawei FusionModule1000A20 Installation Manual page 26

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Figure 4-6 Single-capacity base (unit: mm)
Preparations
Tools: torque wrench, adjustable wrench, level, level gauge, hammer drill, right angle, marker,
ink fountain, long leather measuring tape, claw hammer, vacuum cleaner
Materials: single-capacity base, twistlock, expansion bolt, spacer
Skill requirement: skilled technician
Procedure
Step 1 Determine the installation areas on the concrete platforms and the actual site space. Mark the
installation areas on the concrete platforms using an ink fountain.
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
4 Installing Pre-fab. Modules
20