Mechanical installation
3.3 Mounting
Figure 3-1
The following requirements must be met to ensure the full functionality of the cabinet units:
● The foundation must be level and horizontal.
● Irregularities must be leveled out.
● Gaps where air can enter, created when aligning (e.g.:
closed.
3.3.2.3
Shipping and handling monitors
The cabinet units are equipped with tilt and shock indicators to monitor for damage during
transit.
Figure 3-2
44
Requirements on the levelness of the floor
Tilt indicator
①
in the diagram) must be
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A