Siemens SITRANS LG250 Operating Instructions Manual page 18

Guided wave radar, foundation fieldbus coax probe
Table of Contents

Advertisement

Connection procedure
18
Proceed as follows:
1. Unscrew the housing cover
2. If a display and adjustment module is installed, remove it by turn-
ing it slightly to the left.
3. Loosen compression nut of the cable entry gland
4. Remove approx. 10 cm (4 in) of the cable mantle, strip approx.
1 cm (0.4 in) of insulation from the ends of the individual wires
5. Insert the cable into the sensor through the cable entry
Fig. 7: Connection steps 5 and 6 - Single chamber housing
Fig. 8: Connection steps 5 and 6 - Double chamber housing
6. Insert the wire ends into the terminals according to the wiring plan
SITRANS LG250 - Operating Instructions
PBD-51041056

Advertisement

Table of Contents
loading

Table of Contents