Huawei DBS3900 Installation Manual page 179

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
Context
l
l
l
Procedure
Step 1 Obtain the engineering label to be attached from the whole set of the L-shaped engineering
labels, as shown in
Figure 11-2 Engineering label to be attached
Step 2 Attach the long end of the engineering label to the cable in the position 20 mm away from the
connector, and then turn over the long end along the adhesive face. Ensure that the edges of
the turned-over engineering label are in a line, as shown in
Step 3 Adhere the long end to the labeling area. Ensure that the spacing between the cable and the
labeling area is 2 mm to 3 mm.
Figure 11-3 Adhering the long end to the labeling area
Step 4 Turn over the labeling area along the adhesive face from the bottom, and then finish attaching
the engineering label, as shown in
turned-over labeling area are in a line.
Issue 06 (2015-10-30)
This section applies to Huawei sign plate labels. If other engineering labels in
accordance with local standards are used on site, follow the local standards for attaching
sign plate labels.
In the DBS3900 LampSite solution, blank L-Shaped engineering labels are delivered by
default.
The L-shaped label is usually used for the signal cable, E1/T1 cable, optical cable, and
power cable. The description in this section takes the Ethernet cable in a base station as
an example.
Figure
NOTE
By default, the label is attached in the position 20 mm away from the connector. If required, you can
change the position to make installation faster and more efficient. Consistency and neatness, however,
must be maintained.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11-2.
Figure 11-4
and
Figure
11-3.
Figure
11-5. Ensure that the edges of the
11 Appendix
173

Advertisement

Table of Contents
loading

Table of Contents