Installing Prru Cables; Cabling Requirements - Huawei DBS3900 Installation Manual

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
Step 3 Secure the pRRU onto the separate mounting kit, as shown in
Figure 9-13 Securing the pRRU onto the mounting kit
1.
2.
----End

9.4 Installing pRRU Cables

This chapter describes the procedures for installing pRRU cables.

9.4.1 Cabling Requirements

Cables must be laid out according to the specified cabling requirements to prevent signal
interference.
Issue 06 (2015-10-30)
Hang the two dowels on the top of the pRRU attachment plate onto the mounting kit, and
push the pRRU until it snaps into place, as shown by illustrations a and b in
Use the M6 inner hexagon screwdriver to tighten the screw on the top of the attachment
plate to 7 N·m (61.96 lbf·in.), as shown by illustration c in
NOTE
If a cable listed below is not required, skip the cabling requirements of the cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing a pRRU3907
Figure
9-13.
Figure
Figure
9-13.
9-13.
148

Advertisement

Table of Contents
loading

Table of Contents