Installation Precautions
Location Selection
•
The Toshiba Q9 F
•
Select a mounting location that is easily accessible, has adequate personnel working space, and
adequate illumination for adjustment, inspection, and maintenance of the equipment (refer to NEC
Article 110-13).
•
Do Not mount the Q9 F
fall from its mounting location (equipment damage or injury).
•
Do Not mount the Q9 F
chemicals or gasses, water, solvents, or other fluids.
•
The ambient operating temperature range of the Q9 F
•
The installation location shall not be exposed to direct sunlight.
•
Avoid installation in areas where vibration, heat, humidity, dust, fibers, metal particles, explosive/
corrosive mists or gases, or sources of electrical noise are present.
•
Allow proper clearance spaces for installation. Do not obstruct the ventilation openings. Refer to
the section titled Installation and Connections of the Q9 ASD Installation and Operation
Manual (P/N 59445) for further information on installation and ventilation requirements.
Mounting
•
Only
•
Install the unit in a secure and upright position in a well-ventilated area.
•
Installation should conform to the National Electrical Code (NEC) — Article 110 (Requirements
For Electrical Installations), all regulations of the Occupational Safety and Health
Administration, and any other applicable national, regional, or industry codes and standards.
•
Installation practices should conform to the latest revision of NFPA 70E Electrical Safety
Requirements for Employee Workplaces.
•
It is the responsibility of the person installing the Q9 F
personnel to ensure that the unit is installed into an enclosure that will protect personnel against
electric shock.
4
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net
S
is intended for permanent installations only.
LOW
AVER
S
LOW
AVER
S
LOW
AVER
Qualified Personnel
should install this equipment.
in a location that would produce catastrophic results if it were to
in a location that would allow it to be exposed to flammable
S
LOW
AVER
S
LOW
AVER
Q9 FlowSaver Installation and Operation Manual
is 14° to 104° F (-10° to 40° C).
or the electrical maintenance