Startup And Test - Toshiba H9 ASD Installation And Operation Manual

Adjustable low voltage heavy duty industrial speed drive
Hide thumbs Also See for H9 ASD:
Table of Contents

Advertisement

Startup and Test

DANGER
Before turning on the ASD ensure that:
• R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
• U/T1, V/T2, and W/T3 are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• All personnel are at a safe distance from the motor and the motor-driven equipment.
H9 ASD Installation and Operation Manual
27
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9 asd

Table of Contents