Download Print this page

Motorola AP-5181 Deployment Manual page 25

Hide thumbs Also See for AP-5181:

Advertisement

Deployment Guide
1. Install the silicone rubber gland into the gland housing.
2. Loosely assemble the gland nut onto the gland housing. Do not tighten until the connector is fully
assembled and installed into the desired AP-5181 connection port. This creates the gland assembly.
3. Install the ring seal onto the end of the flange barrel. A small amount of grease on the surfaces will hold
the ring in place for the remainder of the assembly.
25

Advertisement

loading