Toshiba RAV-SM564UTP-E Service Manual page 98

Hide thumbs Also See for RAV-SM564UTP-E:
Table of Contents

Advertisement

No.
Part name
1. Detachment
Heat
11
exchanger
1) Recover the refrigerant gas.
2) Carry out work of item 1 of
3) Remove refrigerant pipe at indoor unit side.
4) Remove the fixing screws and then
remove the piping cover. (Ø4 × 10, 3 pcs.)
5) Remove the drain hose from the drain
pump and remove the fixing screws to
remove the drain pump stand.
(Ø4 × 8, 3 pcs.)
6) While pushing the heat exchanger, remove
the fixing band, fixing screws and the heat
exchanger. (Ø4 × 8, 3 pcs.)
2. Attachment
1) Mount the heat exchanger with the fixing
band and the fixing screws. (Ø4 × 8, 3 pcs.)
2) Fix the parts as before in order of drain
pump stand → piping cover.
3) Connect the refrigerant pipe as before and
then apply vacuuming.
4) Following to work of item 2 of
the parts as before.
Procedure
10
.
10
, attach
Fixing band
Heat exchanger
– 98 –
FILE NO. SVM-13010-2
Remarks
Fixing screws (Ø4 × 10)
Fixing screws (Ø4 ×10)
Piping cover
Fixing screws
Fixing screws
(Ø4 ×1 8 )
(Ø4 × 8)
Drain pump stand
Drain pump stand
Fixing screws
(Ø4 × 8)
Fixing screw
Fixing screw
Fixing band
Fixing band

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents