6.1. CONNECTIONS AND NECESSARY EQUIPMENT

Necessary equipment:
One current source
One DC voltage source
Precision timer for testing timed events
One AC/DC voltmeter/ammeter
Connect the relay as indicated in the external connections diagram, Figure 2.
For safety reasons, the external protection earth should be securely grounded.
Apply dc rated voltage to terminals A10-B10

6.2. VISUAL INSPECTION

Check that the relay has not suffered any kind of damage due to transport and handling.
Check that all the screws are tight and the terminal blocks have not been damaged in any way.

6.3. PANEL INSULATION TESTS

If any insulation test would be performed on the panel where the relay is installed, the ground terminals
A9-B9 must remain ungrounded.
Do the following groups in the terminals of the relay:
Group 1: A10, B10
Group 2: A1 to A4, B1 to B4
Group 3: C9, C10, D9, D10, C11, C12, D11, and D12
Group 4: A11, B11, A12, and B12
Group 5: C1, D1, C2, D2, C3, and D3
Group 6: C4, C5, C6, C7, C8, D4, D5, D6, D7, and D8
If the relay has expansion board, then the following groups must be added:
Group 7: E7, F7, E8, F8, E9, F9, E10, F10, E11, F11, E12, and F12
Group 8: E1, F1, E2, F2, E3, F3, E4, F4, E5, F5, E6, and F6
Apply 2000V gradually between case and groups.
Apply 2000V gradually between groups.
GEK-106168E
!
DBF Breaker Failure Protection

6. ACCEPTANCE TESTS

ACCEPTANCE TESTS
ACCEPTANCE TESTS
ACCEPTANCE TESTS
ACCEPTANCE TESTS
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbf

Table of Contents