Power Off Procedure - Bosch DVA-16K SCSI Installation Manual

Raid subsystem scsi premium series
Hide thumbs Also See for DVA-16K SCSI:
Table of Contents

Advertisement

RAID Subsystem DVA-16K | Installation Manual
The LCD screen startup sequence is shown and described in the sequence below:
Initializing....
Please Wait...
DVA-16K
Modem Not Config
DVA-16K
256MB RAM, Wait...
DVA-16K
No Host LUN
5.5

Power Off Procedure

If you wish to power down the RAID subsystem, please follow these steps:
NOTICE!
i
If you wish to power down the RAID subsystem, please ensure that no time-consuming pro-
cesses, like a "logical drive parity" check or a "background scrub," are running.
1.
2.
3.
Bosch Security System
Stop I/O access to the system.
Use the software provided on the host computer to stop all IO accesses to the RAID sub-
system. Please refer to the user's manual that came with your host computer.
Flush the cache.
Use the "Shutdown Controller" function to flush all cached data. This prepares the RAID
subsystem to be powered down.
Turn off the power.
Turn off the power switches at the top of the rear panel. Once the subsystem has been
powered down, other devices that are connected to the subsystem may be powered
down.
Subsystem Connection and Operation | en
This screen appears when the PSUs are turned on.
This screen appears after the initialization process.
It clearly shows the model name.
Verifying installed cache memory.
System is ready. You can now start to configure the
subsystem.
41
F.01U.027.799 | V2 | 2008.08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dva-16k series

Table of Contents