Ethernet Connection; 3.0 Setup; Setting P3; Setting The Dip Switches - Bosch Conettix C900V2 Installation Manual

Dialer capture ethernet module
Hide thumbs Also See for Conettix C900V2:
Table of Contents

Advertisement

Conettix C900V2 | Installation Guide | 3.0
2.7

Ethernet Connection

One of the RJ-45 jacks connects the C900V2 to
the Ethernet Network (LAN or WAN).
The connector pins are listed in Table 3.
Table 3:

Ethernet Connector Pins

Pin
Connection
1
TX+
2
TX–
3
RX+
6
RX–

3.0 Setup

3.1

Setting P3

A shorting link on P3 selects the voltage and
current applied to the alarm panel's telephone
circuit to simulate the signal from a PSTN
telephone exchange. For most alarm panels, set
the shorting link to the H position (short the middle
and right pins of P3). The L position results in
slightly lower power consumption for the C900V2
but some alarm panels might report a telephone
line failure when dialing the C900V2.
For UL approved applications, the
shorting link must be set to the H
position.
8
Setup
3.2

Setting the DIP Switches

A ten-position DIP switch programs the C900V2.
The programming depends on the application and
dialer format of the control panel connected to the
module.
Figure 8:
1
2
O
N
1 – Off
2 – On
Because the C900V2 emulates a phone
line and a digital receiver, you must
program the C900V2 to the format it
receives from the control panel.
DIP Switch positions 1 through 4 and 10 program
the dialer format into the C900V2. Table 4 on page
9 lists the format programming for these DIP
switches.
Bosch Security Systems, Inc. | 8/08 | F01U087780-01

C900V2 DIP Switches

3
4
5
6
7
8
9
10
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents