Step 1, Slide The Oven Into The Cutout; Step 2, Install Bottom Trim; Step 3, Install Mounting Screws; Step 4, Finalize Installation - GE PSB9100DFBB Installation Instructions Manual

120v built-in speedcook ovens
Hide thumbs Also See for PSB9100DFBB:
Table of Contents

Advertisement

Available languages

Available languages

SLIDE THE OVEN INTO THE CUTOUT
1
CAUTION:
to lift the oven into the opening. Grasp the bottom
PRECAUCIÓN:
dos personas para levantar el horno e introducirlo
en la abertura. Agarre la parte inferior por delante
power cord.
way. Leave the oven a few inches forward of the
cabinet frame.
under the oven or along the sides of the oven.
Two people are required
Se requieren
Installation
INSTALL BOTTOM TRIM
2
of the oven.
using 3 brass screws provided.
INSTALL MOUNTING SCREWS
3
side.
flange.
FINALIZE INSTALLATION
4
should come on when the door is opened.
instructions.
8
's Manual for operating
Printed in Korea

Advertisement

Table of Contents
loading

Table of Contents