GE CW9000SDSS Use And Care Manual page 14

Electric
Hide thumbs Also See for CW9000SDSS:
Table of Contents

Advertisement

Installation of the warming drawer.
Read these instructions completely and carefully.
Provide Cabinet Support
23
"
1 2
IMPORTANT: When installed below a single or double oven,
check to be sure that any oven supports above the cutout do
not obstruct the 23
" required depth of the warming drawer
1 2
cutout.
A 2" minimum clearance between oven and warming
drawer cutouts are required. Additional clearance may be
required if 2 x 4 blocks are used to support runners or solid
floor of the oven above.
The warming drawer may be supported by either a solid
bottom, 2 x 4 or 2 x 2 runners.
The support must be level and rigidly mounted, flush with
the bottom edge of the cutout.
WARNING: ANTI-TIP PRECAUTIONS:
The anti-tip brace must be installed to prevent the drawer
from tipping forward when opened and loaded.
Failure to do so could result in personal injury.
14
2" x 4" or equivalent runners
22"
27"
2" x 4" or equivalent
23
"
1 2
There is no way to level the drawer once it has been
installed. Be sure supports are level.
The entire weight of the drawer is supported by the
runners or solid floor and must be capable of supporting
150 lbs.
9"
2x4 or 2x2 runners
or solid bottom
runners
25"
30"
Install 2x4 or 2x2 anti-tip
brace against rear cabinet
wall 9" from floor to
bottom of brace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pj7000sfssPw9000dfbbPw9000sfssPkd915Ptd915Cw9000 ... Show all

Table of Contents