GE 30" Vented Hood Use And Care & Installation Manual page 5

30" vented hood
Table of Contents

Advertisement

2. Attach the damper/duct
connector.
#8-1 8 x 318"
ELECTRICAL
KNOCKOUTS
FRONT
OF HOOD
Use two (2) screws (provided) to attach the connector
to the housing. The damper flap should open in the
direction indicated by the arrow.
3. Remove
the electrical
knockout.
Choose either the top or side of the housing for the
electrical cable entrance.
Remove the appropriate
knockout.
4. Set the housing
into the opening.
SLIDE
Carefully lower the housing into the cabinet opening
with the slide control to the front
5. Remove
the access
cover.
I
ACCESS
COVER
6. Open the filter
)and.
VISOR
SLIDES
Pull the visor slides out. Rotate
the panel
clips
and swing the panel open.
7. Install the mounting
brackets.
INSTA_R
S
Insert the bent end of the installation rod into the
access hole in the housing.
BRACKET
Choose the mounting
bracket with the center hole.
Hang the bracket from the rod, through this center
hole, as shown. Pull the bracket up between the
cabinet and housing.
#8-18 x 2"
OR
#8-1 8 x 1"
INSERT
SCREWS
HERE
Hold the mounting bracket in place with the rod. Two
sets of screws are provided. Use the short screws for
flush bottom cabinets or the long screws for recessed
bottom cabinets. Insert two (2) screws through the
housing and into the mounting
bracket. Do not tighten
the screws completely.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jv394Jv395Jv396Jv930

Table of Contents