HP D5970A - NetServer - LCII Installation Manual page 35

Processor upgrade installation guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 3
Terminator Board
Retaining Latches
Terminator Board
Secondary Processor Position
Figure 3-15. Install the Terminator Board in a Single-Processor
2. Insert the terminator board into the upper (secondary) processor position.
3. Verify that the terminator board is installed completely in the slot. When
the terminator board is installed completely, the retaining latches (see
Figure 3-15) will be closed.
HP NetServer LC 3 or LH 3/3r
Installation in LC 3 and LH 3/3r
Primary Processor
Module
31

Advertisement

Table of Contents
loading

Table of Contents