3. Mount the HP FC-AL Hub into the Cabinet
The HP FC-AL hub mounts into the HP E3662A or E3662B 2.0m high, 19-inch wide, 220VAC, EIA cabinet (also called
a rack). The following procedure describes mounting an HP FC-AL hub with its front panel facing the rear of the
cabinet. The front of the HP FC-AL hub contains the 10 Fibre Channel connectors.
a.
Record the serial number, located on the bottom of the HP FC-AL hub, before installing the HP FC-AL hub into the
cabinet.
b.
Power down the cabinet and unplug it from the power source. Refer to the cabinet documentation for more
information. Make sure the cabinet is adequately secured and has enough space (1 EIA) for the HP FC-AL hub.
Remove filler panels as needed from the front of the cabinet and open the rear door.
c.
Slide a sheet metal nut onto the outer column in the back of the cabinet, so the hole in the nut is aligned with the
hole at the selected EIA location on the column.
d.
Insert one end of the left rail in the adjoining slot, so the hole in the rail lines up with the holes in the nut and column
(see figure 6).
e
Attach the other end of the rail to the inner column on the front of the cabinet using the same procedure and a second
sheet metal nut.
NOTE
f.
Repeat steps c, d, and e to install the right rail.
Do NOT attach screws at this time.
Figure 6. Installing rails for the FC-AL hub into the cabinet