GE GL317D Instruction Manual page 133

Sf6 circuit- breaker
Table of Contents

Advertisement

Presentation
Principle
Necessary equipment
and tools
In this module
11- 2016
Installation
Pre- filling with SF
The pre- filling of the pole with SF
vacuum operation.
NOTE : You are reminded that the gas used to fill the pole must
conform to the requirements laid out in IEC 60376.
List of the necessary ALSTOM Grid equipment and tools for the pre- filling
with SF
gas :
6
Mark
Diagram
(4)
(10)
(8)
* depending on the aparatus.
This module contains the following topics:
Preparing the SF
gas bottle
6
Pre- filling with SF
gas
6
GE Information
gas at 0.05 MPa
6
gas at 0.05 MPa must be done after the
6
Designation
Filling tool
Pressure reducer
SF
gas bottle(s)
6
Topic
Number
1
1
*
Page
2
3
L31- 951EN/06
1/4