D-Link DGS-3130 Series Hardware Installation Manual page 38

Layer 3 stackable managed switch
Hide thumbs Also See for DGS-3130 Series:
Table of Contents

Advertisement

DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
1. Insert one end of the 22-pin DC power cable into the receptacle on the Switch and the other end into the
Redundant Power Supply unit.
2. Using a standard AC power cable, connect the redundant power supply to the main AC power source. A
green LED on the front of the DPS-700 will glow to indicate a successful connection.
3. Re-connect the Switch to the AC power source. The LED indicator will show that a redundant power supply is
now in operation.
4. No configuration in the Switch's firmware is needed for this installation.
NOTE: See the RPS Quick Installation Guide for more information.
CAUTION: This equipment is to be connected only to PoE networks without routing to the
outside plant.
Figure 3–13 Front view of the DPS-700
38

Advertisement

Table of Contents
loading

Table of Contents