Download Print this page

Toshiba RBC-VNMC-HE1 Installation Instructions Manual page 2

Vn unit heater controls

Advertisement

VN Unit Heater Controls Description and Contents
This manual covers the VN unit heater options. Each of the components are
ordered and supplied separately.
RBC-VNMC (HE1) Heater Controller
The controller will enable the pre-heater if the temperature falls below the
value set in configuration item 67 (Please see the Table 1) the heater will
operate for a fixed period of time set in configuration item 68 (Please refer to
Table 2). The heater will only operate when the Heat Exchange Unit is
operating and will provide a run on time to remove any residual heat if the unit
is switched off on the remote controller.
Contents:
Control Panel
Installation/Operating Manual.
RBC-VNMH1, RBC-VNMH2, RBC-VNMH3 & RBC-VNMH4 Heat Exchanger
unit Heater Batteries
The heater batteries are available in three sizes for use with your selected VN
unit. The heater batteries can be used as a pre-heater.
Model
Heater Size
RBC-VNMH1
1x1Kw Heater
RBC-VNMH2
1x1Kw Heater
RBC-VNMH3
2x1Kw Heater
RBC-VNMH4
2x1Kw Heater
Contents:
Heater Battery.
Airflow Pressure Switch
Installation/Operating Manual.
Duct Diameter
VN Model
VN-M150HE
100
VN-U00151SYE
150
VN-M250HE & VN-M350HE
VN-U00251SY-E & VN-U00351SY-E
VN-M500HE & VN-M650HE
200
VN-U00501SY-E & VN-U00651SY-E
VN-M800/1000HE & VN-M1000HE(HE1)
250
VN-U00801SY-E & VN-U01001SY-E
2

Advertisement

loading

This manual is also suitable for:

Rbc-vnmh1Rbc-vnmh2Rbc-vnmh3Rbc-vnmh4