Hitachi KPI Installation And Operation Manual page 27

Energy recovery ventilation unit
Hide thumbs Also See for KPI:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
INSTALLATION
13.7.1 ELECTRICAL WIRING DIAGRAMS
The electrical wiring connection for the KPI unit is shown in the following figures.
Through the wiring connection hole in the cabinet, connect the cable of the remote control switch or an optional extension cable to the connectors
on the printed circuit board inside the electrical box.
Connect the power supply wires and the ground wire to the terminals in the electrical box.
Connect the wires between the KPI unit and the indoor unit to the terminals in the electrical box.
Controlled network system (CSNET WEB)
¡
Indoor unit
RSW1
Indoor unit
RSW1
KPI + PC-ART
¡
RSW1
DSW6
DSW6
PC-ART
DSW6
PC-ART
RSW1
PC-ART
Indoor unit
RSW1
DSW6
Indoor unit
RSW1
DSW6
DSW6
KPI
RSW1
DSW6
KPI
RSW1
DSW6
PC-ART
27
PMML0185 rev.1 - 03/2010

Advertisement

Table of Contents
loading

Table of Contents