3.9
DC Arc Flash Warning
4
Unpacking
4.1
General Instructions
Unpack the SCiB ESS Cabinet indoors on a paved floor. The system should be as close as possible to its final location.
Allow enough space for forklift operations to unpack the units from their packing crates. Then remove the crates. Properly
dispose of the crate.
Points to observe:
•
Retain all small articles during unpacking and installation.
•
Make sure that exterior paint is not scratched and that no cabinets are damaged before uncrating.
•
DO NOT damage the units when using tools to remove packaging materials.
•
If provided, DO NOT remove the protective plastic sheet cover until installation.
•
Immediately report any abnormalities to Toshiba Customer Support Center or an authorized representative.
4.2
Unpacking the SCiB ESS Cabinet
10
FIGURE 3.1: ARC FLASH WARNING
CAUTION
TOP HEAVY EQUIPMENT. THIS EQUIPMENT WILL TIP OVER EASILY
UNTIL FIXED IN PLACE.
Lift and move carefully, and only with adequate equipment and trained
personnel. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.
288V SCiB Energy Storage System Installation and Operation Manual – 203810-000