Energizing The Ied - Hitachi Relion 670 Series Quick Start Manual

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK500129-UEN Rev. J
5.3

Energizing the IED

Before connecting the auxiliary power, check that the terminal strip is wired and placed correctly.
Remove the protective film from the top side of the unit.
During IED start-up, you can observe the following sequence:
1.
The Green Ready LED starts to flash.
2.
The LCD lights up and starting... is displayed.
3.
The main menu is displayed. A final steady green Ready LED indicates a successful start-up of
the device.
If the self supervision of the IED detects a diagnostic error during the start-up process, the green
Ready LED flashes. Further information on the error may be visible on the local HMI under Main
menu/Diagnostics/IED status/General. Note down the displayed information as reference when
contacting Hitachi Energy technical support.
670/650 series
Quick start guide
© 2018 - 2023 Hitachi Energy. All rights reserved.
Section 5
Powering up the IED
GUID-E40DE80C-8DA4-4E17-876C-4CC3CE706347 v6
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents