Step 4
1. Fit a ferrite core to the motor cable, as shown
2. Connect the power and motor cables to the
3. Ensure the cables are correctly secured by the
Step 5
1. Push the gland plate against the Power
2. Ensure that the cables are pulled through the
3. Screw the gland plate securely into place with
4. Ensure that the seals are correctly in place to
5. Tighten the cable glands to a maximum torque
6. Fit grommets to the gland plate holes that
The grommets are provided in the Accessory Bag
provided with the product.
Power Module PM230 IP55
Hardware Installation Manual, 2010-07-02, A5E02923635A AB
in the diagram on the right (for Class B filtered
variants only).
Power Module terminals.
screening clamps.
Module base.
cable glands to remove excess cable from
inside the Power Module housing.
a maximum torque of 2.0 Nm (17.7 lbf.in)
maintain the IP55 rating.
of 2.5 Nm (22.12 lbf.in).
have no cables.
Connecting
4.6 Wiring Sequence
47