Check Of Voltage Differential Trip And Alarm Levels - Hitachi RED670 Commissioning Manual

Hide thumbs Also See for RED670:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
IEC07000107 V2 EN-US
Figure 48:
where:
1
2
2.
Apply voltage higher than the highest set value of UDTrip, U1Low and U2Low to the U1 three-
phase inputs and to one phase of the U2 inputs according to figure 48.
The voltage differential START signal is set.
3.
Decrease slowly the voltage in phase UL3 of the test set until the START signal resets.
4.
Check U2 blocking level by comparing the voltage level at reset with the set undervoltage
blocking U2Low.
11.6.5.3

Check of voltage differential trip and alarm levels

Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 49.
188
UL1
UL2
UL3
UN
Connection of the test set to the IED for test of U2 block level
is three-phase voltage group1 (U1)
is three-phase voltage group2 (U2)
© 2017 - 2022 Hitachi Energy. All rights reserved
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000107-1-en.vsd
Line differential protection RED670
1MRK 505 378-UEN Rev. K
SEMOD175258-104 v3
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents