5
Reassembly
The reassembly is done in the following order:
1. Front Housing LCM TP Assembly
2. Main PBA (a) & RF Cable (b)
3. Sub PBA assembly
4. Middle Frame Assembly
5. Battery
6. Battery Cover
5.1
Front Housing LCM TP
Assembly
Prepare the Front Housing LCM TP Assembly.
Assemble a new Conductive cloth for TP IC.
Attach the new Conductive cloth for TP IC at correct
position.
Note: Yellow Film inside cloth covers TP IC completely.
1273-2279 Rev3
Sony Mobile Communications AB – Company Internal
Working Instruction Repair Instruction Mechanical/
2a
1
6
5
4
2b
3
38(50)