Communication Kit Installation; Mechanical Installation - LG PUDCA0 Installation Manual

Ahu communication kit
Table of Contents

Advertisement

COMMUNICATION KIT INSTALLATION

Mechanical installation

1
Remove the Comm. Kit box cover by unscrewing the plastic bolt (6EA)
2
Drill 4 holes on correct position and fix the Comm. Kit box securely with 4 screws
(Field supply) through the provided holes Ø4.5 mm (Reference the length of the holes Ø4.5)
Provided holes
Ø4.5 mm (4EA)
!
WARNING
• Install where it can sufficiently support the weight of the comm.Kit.
If the support strength is not enough, the outdoor unit may drop and hurt people.
• Install where the comm.kit may not fall in strong wind or earthquake.
If there is a fault in the supporting conditions, the comm.kit may fall and hurt people.
• It is installed at a place with a lot of snowfall, install with the place higher than the most
extreme snowfall amount standard.
COMMUNICATION KIT INSTALLATION
348 mm
13

Advertisement

Table of Contents
loading

Table of Contents