System Test Flow - LG DP471B Service Manual

Hide thumbs Also See for DP471B:
Table of Contents

Advertisement

3. SYSTEM TEST FLOW

TEST Start
Make sure
PCBA no short. Especially
power block.
YES
Switch power on
Is
the DC voltage correct?
DC 5V,3.3V,1.8V
YES
Flash upgrade
OK
A
LGE Internal Use Only
NO
Repair short problem.
NO
Repair DC output problem.
1. Check code version
2. Check Crystal clock is 27MHz
NO
3. Check SDRAM clock.
4. Check reset circuit.
5. Check debug setting.
3-4
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp472bDp473b

Table of Contents