Figure 4-9 Installing a return air duct
----End

4.3.5 Installing Water Pipes

Installing Water Pipes
● Ensure that the external pipes are clean and free from foreign matter before
connecting to the water inlet and outlet pipes. Do not let external impurities
enter the pipes.
● The water inlet and outlet pipes of the unit are connected using screw threads.
Do not exert excessive force when connecting the pipes to avoid damaging the
pipes. (Use two pipe pliers or chain pliers to connect pipes.)
Water pipes need to be prepared onsite. If galvanized steel pipes are used,
stainless steel connectors must be used to ensure sealing.
After water pipes are installed, wrap thermal insulation foam.
Issue 01 (2021-01-30)
NO TE
● The air duct must be wrapped with thermal insulation foam, and the thickness of the
thermal insulation foam must be greater than or equal to 3 cm.
● The joint between the air duct and the unit should be sealed to prevent air leakage.
Generally, the sealing cotton is pressed inside the flange of the air duct or sealant is
applied to the flange after installation.