I NT ER LO C K S BE T W EE N PA NE LS
Step 2/10
Close the circuit breaker in the feeder to be tested. Check the circuit breaker status on the
protection relay LHMI.

Figure 74: Single line diagram circuit, the circuit breaker is closed and in the service position

Step 3/10
Close all upstream breakers in the relative section, such as the Incomer, Generator and Bus
tie.
Step 4/10
On the protection relay LHMI (upstream breaker receiving CBFP trip command) go to -> Main
Menu/Test/IED test
– Test mode = IED test
The ready LED is flashing when the protection relay is in the test mode.

Figure 75: Entering test mode

Step 5/10
On the protection relay LHMI (tested feeder) go to -> Main Menu/Test/IED test
– Test mode = IED test
The ready LED is flashing when the protection relay is in the test mode.