Advertisement

4.3

Wiring

4.3.1

Connecting to the network

(1) Be sure to check the following points before connecting the inverter to the network.
Check that the correct node address is set. (Refer to page 46)
Check that the FL-net dedicated cable is correctly connected to the FL remote communication connector. (Refer to page 48)
(2) System configuration
Segment 1
Master
4.3.2

Precautions for system configuration

Enough safety measures are necessary when installing the FL-net dedicated cable and connecting to the FL remote
network.
Consult the network provider and network administrator (person in charge of network planning and IP address
management) including terminal treatment of connection cable, construction of trunk cable, etc.
We are not responsible for system troubles from connecting to the FL remote network.
4.3.3

Cable specifications

Use the following FL-net dedicated cables.
Cables
:TPCC5 or more(Twisted Pair Communication Cable for LAN Category 5)
For the shape, use STP (Shielded Twisted Pair)
(according to the 100BASE-TX(IEEE802.3u) standard)
Maximum wiring length :100m maximum between the hub and the inverter
(according to the 100BASE-TX(IEEE802.3u) standard)
REMARKS
FL-net dedicated cable...recommended product (as of October 2009)
Model name
FLG-S-
(Example: when the cable length is 1m) FLG-S-010
Personal computer
Hub
Cascade connection (100m maximum)
100m maximum
(
)
Inverter
Inverter
Overall length: 2000m maximum
Cable length
1m to 100m
Segment 2
Inverter
Inverter
Manufacturer
Shinwa Co., Ltd.

Wiring

Hub
Inverter