Installing The Cartridge Group; Fig. 50: Lifting The Cartridge Group And Rotating It; Fig. 51: Installing The Cartridge Group - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8 Dismantling and fitting / 8.15 Installing the cartridge group
8.15

Installing the cartridge group

Lifting the cartridge group and rotating it by 90°
Fig. 50: Lifting the cartridge group and rotating it by 90°
1. Loosen and remove nuts.
2. Lift the cartridge group out of the service support (90012).
3. Insert the screws of the service support from above and fit ring nuts (VRM) with washers.
4. Attach lifting gear to the ring nuts (VRM).
5. Lift cartridge group at the side of the ring nuts (VRM) and turn it into a vertical position.
Installing the cartridge group
Fig. 51: Installing the cartridge group
© Copyright 2020 ABB. All rights reserved.
HZTL4031_EN
Rev.K
February 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht845321

Table of Contents