Huawei STS-6000K-H1 Installation Manual page 27

Smart transformer station
Hide thumbs Also See for STS-6000K-H1:
Table of Contents

Advertisement

STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
Stage
Procedure
Step 1 Determine the installation position of the container based on the foundation design drawings.
Step 2 Measure the support points for the container on the foundation. Ensure that the support points
are on the same plane and the deviation is no more than 5 mm.
Step 3 Hoist the container to the installation position using a crane.
Issue 02 (2020-02-21)
Precautions
container is less than or equal to 5 degrees.
Ensure that the angle between every two ropes is less than or equal
to 90 degrees.
Lift and land the container slowly to prevent shock to equipment
inside it.
Remove the ropes after ensuring that the container is placed evenly
on the container bases.
Do not drag steel ropes and hoisting tools or bump hoisted objects
against hard objects during hoisting.
Secure the container you have hoisted before hoisting another
container.
Copyright © Huawei Technologies Co., Ltd.
3 Equipment Installation
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents