Download Print this page

Husqvarna BG 245E Operator's Manual page 8

Advertisement

To do the troweling operation
1. Start the motor. Refer to
page 7 .
2. Turn the blade adjustment knob until there is tension
in the cable.
3. Move the product across the concrete surface.
a) Adjust the blade adjustment knob as necessary
during operation.
CAUTION: Do not increase the blade
angle too much and too quickly. The
increased pressure from the product can
cause damage to the concrete surface.
4. Stop the product and remove it from the concrete
surface.
5. Wait until the concrete is sufficiently set.
6. Do the procedure again and again until the concrete
surface has a satisfactory finish and is fully set.
Note: The period of time between troweling operation is
calculated from how quickly the concrete sets.
To move the product in different
directions
To turn to the left, lift the handles.
To turn to the right, push the handles down.
8
To start the product on
To move the product forward, push the handles
forward.
To move the product rearward, pull the handles
rearward.
To adjust the blade angle
The blade angle is adjusted gradually.
1. To increase the blade angle, turn the blade
adjustment knob clockwise.
2. To decrease the blade angle, turn the blade
adjustment knob counterclockwise.
1132 - 001 - 06.04.2020

Advertisement

loading