Connection, Wiring, And Attaching - Hitachi SRW-0J Instruction Manual

Remote operator
Table of Contents

Advertisement

3.1
Connect to inverter
3.1.1 Connecting to operator on the surface of cover (SJ300/L300P series only )
1. After setting up like a following figure, insert the operator to the connector vertically.
2. Turn on the power supply of the inverter , and Confirm that LCD screen of the operator is
ON.
3.1.2 Connecting by cable (Option)
1. Insert the both end of cable to main body and operator.
2. Turn on the power supply of the inverter , and Confirm that LCD screen of the operator is
ON.
SJ300,L300P,SJ100,L100 series
J300.L300,J100,J200JH300,J500,L50
series
UNIT
Chapter 3 Connection, wiring, and attaching
Cable
ICS-1 , ICS-3
ICS-1J ,ICS-3J

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srw-0ex

Table of Contents