Installation; Installing The Tumble Dryer On Boats; Downtime After Installation; Levelling The Tumble Dryer - Miele PDR 908 HP Marine Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Installation

Ensure that no closeable door, slid-
ing door, or an oppositely hinged
door is installed that would hinder
the door of the tumble dryer being
opened in any way.

Installing the tumble dryer on boats

On other types of floor structures (in
cases where the tumble dryer is in-
stalled on sea-going vessels, for ex-
ample), the fixing materials must be
provided on site.
When installing the appliance on
sea-going vessels, the tumble dryer
must be secured to prevent slipping
and tipping, by fastening it to the
floor of the vessel (e.g. using clamps
that are welded to the floor of the
vessel).
 Secure all four of the tumble dryer's
feet.

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.

Levelling the tumble dryer

The appliance must stand perfectly
level on all four feet to ensure safe and
proper operation.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.
This tumble dryer is not suitable for
building under.
Never block the ventilation slots on
the tumble dryer. Do not block the
gap between the bottom of the
tumble dryer and the floor with plinth
facings, deep pile carpet etc. This
would hinder a sufficient flow of air
to the tumble dryer.
Installation
79

Advertisement

Table of Contents
loading

Table of Contents