Commissioning Preparations - Huawei Airbridge BTS3606E Commissioning Manual

Table of Contents

Advertisement

Airbridge BTS3606E&3606AE
System Commissioning Guide
About This Chapter
The following table lists the contents of this chapter.
Title
1.1 BTS Equipment
1.2 Tools for Commissioning
1.3 Personnel
1.4 Site Information
1.5 Data Configuration Files
Issue 02 (2006-10-10)
1

Commissioning Preparations

Huawei Technologies Proprietary
Description
Describes the BTS equipment to be verified before
commissioning.
Describes the tools involved in commissioning.
Describes the personnel required for commissioning.
Describes the site information to be collected before
commissioning.
Described the requirements for data configuration files.
1 Commissioning Preparations
1-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606ae

Table of Contents