5
Installation(Inner Finisher-A1) > Kontrollen vor der Installation (German/Deutsch) > Vorsichtshinweise zur Installation
Making Pre-installation Checks
Cautions at the Installation
1. How to Disconnect the Main Power
1) Turn OFF the main power switch of the Host Machine.
2) Be sure that the Control Panel Display and the Main Power Lamp are both turned OFF,
and then disconnect the power plug.
MEMO:
In case the USB Device Port-B1 is about to be installed in the host machine besides
the Inner Finisher-A1, fit the DP support plate and the cables contained in a carton box
of the USB Device Port-B1 prior to the installation of the Inner Finisher-A1.
If the USB Device Port-B1 has already been installed in the host machine, tentatively
remove the device port ody (except for the DP support plate and the cales) prior to
the service manual of the Inner Finisher-A1.
5
Installation(Inner Finisher-A1) > Kontrollen vor der Installation (German/Deutsch) > Vorsichtshinweise zur Installation
Kontrollen vor der Installation (German/Deutsch)
Vorsichtshinweise zur Installation
1. Unterbrechen der Netzversorgung
1) Schalten Sie den Netzschalter der Hostmaschine aus.
2) Überzeugen Sie sich zunächst, dass sowohl das Display auf dem Bedienfeld als auch
die Netzstrom-Kontrolleuchte erloschen sind, und ziehen Sie dann den Netzstecker.
F-5-1
F-5-1
5-2
F-5-2
F-5-2
5-2