Preparation Stage-Recommended Tools/Instruments; Table 3-5: Recommended Tools And Instruments - Samsung 136S Installation Manual

Lithium ion battery system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

.
Assembling the Product
3
3.6 Preparation Stage—Recommended Tools/Instruments
Installers must provide these tools for installing the battery:

Table 3-5: Recommended Tools and Instruments

No.
Items
Power Screwdriver/Drill
1
(Max torque: 26Nm/270 kgf/cm)
2
Torque Limiter
3
Phillips Screwdriver or Bit
4
Box Cutter
5
Forklift
6
Insulated Torque Wrench
Insulated Sockets
7
(13 mm, 17mm and 19mm)
8
Insulated Extension for Socket
9
Inclinometer/Level
12
Usage
To fasten switchgear and SMPS
assemblies to the rack frames
(5.1–6.1Nm/50–60 kgf/cm)
For use with torque wrench
To fasten switchgear and SMPS
assemblies to the rack frames
(M5 Tip)
Opening boxes
Moving rack frames and pallets
containing modules and switchgear
Installing a high-current cable
8.16–30 Nm (72–265 in lbs)
Installing power cables and busbars
Installing a power cable
Installing a rack frame
Appearance
ET003222373
English 4/2018. Rev 0.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents