Hitachi Compute Rack 220H Getting Started Manual page 36

Hide thumbs Also See for Compute Rack 220H:
Table of Contents

Advertisement

Network interface connectors 1, 2
The status LEDs on the connector are explained as follows.
Figure 2-8: Network interface connectors status LED
Table 2-8: Network interface connectors status LED indicate
Location
1
2
* AC power is still supplied even if the power of the system unit is turned off, but this LED will be turned
off because only link by 10BASE-T can be established.
2-10
1
2
Name
Green-On
Green-Blink
Activity LED
Off
Amber-On*
Green-On*
Amber-Blink
Link LED
Green-Blink
Off
Onboard LAN controllers (network interfaces) displayed by the
device manager are as follows:
Onboard LAN1: PCI bus 8, device 0, function 0
Onboard LAN2: PCI bus 8, device 0, function 1
The number of the network adapter which is the network interface
connector recognized by the device manager may not match to the
network interface connector number.
Hitachi Compute Rack 220H Getting Started Guide
State
A link with a hub has been established.
Data is being transmitted or received.
A link with a hub has not been established.
A 1000BASE-T link with a hub has been
established.
A 100BASE-TX link with a hub has been
established.
A 1000BASE-T link with a hub is being
established.
A 100BASE-TX or 10BASE-T link with a hub is
being established.
A 10BASE-T link with a hub has been
established or link with a hub has not been
established.
The Activity LED shows either case.
Overview
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents