Yamaha F-20B Service Manual page 6

Hide thumbs Also See for F-20B:
Table of Contents

Advertisement

F-20B
4.
MAIN 2/2 Circuit Board
(Time required: about 3 min)
4-1
Remove the pre-main unit. (See Procedure 1)
4-2
Remove the screw marked [C80]. The MAIN 2/2
circuit board can then be removed. (Fig.3, Fig.5)
5.
Power Transformer (Time required: about 4 min)
5-1
Remove the pre-main unit. (See Procedure 1)
5-2
While holding the nuts marked [P70] with a
spanner, remove the two (2) screws marked [P60].
The power transformer can then be removed.
(Fig.4)
MAIN1/2 Circuuit Board
MAIN1/2 Circuuit Board
[P40]
[A120]
6
[P80]
[P80]
MAIN1/2 Circuuit Board
MAIN1/2 Circuuit Board
(Fig. 3)
MAIN
2/2
Power Transformer
Power Transformer
[P80]
[P70]
[P60]
MAIN
1/2
[P100], [C]
[A120]: Hexagonal Nut 9.0 12X2 MFNI33 (LX200060)
[A140]: Hexagonal Nut 12.0 14X2 MFNI33 (ES200210)
[P60]: Pan Head Screw 4.0X10 MFZN2BL (V7018000)
[P70]: Hexagonal Nut #1 4.0 MFZN2Y (VB837300)
[P80]: Bind Head Screw-1 3.0X16 MFZN2BL (V7018100)
[P100]: Knob (V6955100)
(Fig. 5)
[P70]
[P70]
[P60]
[P60]
(Fig.4)
Power Transformer
[P40]
[P60]
[P70]
[A140]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents