GE L90 Instruction Manual page 421

Ur series line current differential system
Hide thumbs Also See for L90:
Table of Contents

Advertisement

5 SETTINGS
LINE END OPEN PICKUP DELAY: This setting defines the pickup value for validation of the line end open conditions
as detected by the Line Pickup logic through the
condition is a requirement for the POTT scheme to return a received echo signal (if the echo feature is enabled). This
value should take into account the principle of operation and settings of the Line Pickup element.
POTT SEAL-IN DELAY: The output FlexLogic operand (
seal-in time delay is applied to this operand for coping with noisy communication channels. The
defines a minimum guaranteed duration of the
scheme, the trip operands
GND DIR O/C FWD: This setting defines the FlexLogic operand (if any) of a protection element that is used in addition
to the Zone 2 for identifying faults on the protected line, and thus, for keying the communication channel and initiating
operation of the scheme. Good directional integrity is the key requirement for an over-reaching forward-looking protec-
tion element used as
GND DIR O/C FWD
ing the user to combine responses of various protection elements, or to apply extra conditions through FlexLogic
equations, this extra signal is primarily meant to be the output operand from either the negative-sequence directional
overcurrent or neutral directional overcurrent. Both of these elements have separate forward (
output operands. The forward indication should be used (
security and to overcome spurious directional element operation during transients, adding at least 0.5 cycles of pickup
delay to the forward directional element is recommended.
POTT NO OF COMM BITS: This setting specifies the number of bits of the communications channel available for the
scheme. The transmit codes and trip tables of the POTT scheme are the same as those for the permissive under-
reaching transfer trip scheme. Please refer to the description of the PUTT scheme for more information.
POTT RX1 through POTT RX4: These settings allow the user to select the FlexLogic operands that represent the
receive signals for the scheme. Typically input contacts interfacing with a signaling system are used. In single-bit appli-
cations,
must be used. In two-bit applications,
POTT RX1
,
,
POTT RX1
POTT RX2
POTT RX3
GE Multilin
LINE PICKUP LEO PKP
POTT OP
,
,
and
are sealed-in for the same period of time.
POTT TRIP A
B
C
3P
. Even though any FlexLogic operand could be used as
, and
must be used.
POTT RX4
L90 Line Current Differential System
FlexLogic operand. The validated line end open
) is produced according to the POTT scheme logic. A
POTT OP
pulse. As this operand activates the trip table of the POTT
or
NEG SEQ DIR OC1 FWD
NEUTRAL DIR OC1 FWD
and
must be used. In four-bit applications,
POTT RX1
POTT RX2
5.7 CONTROL ELEMENTS
POTT SEAL-IN DELAY
allow-
GND DIR O/C FWD
) and reverse (
FWD
REV
). For greater
5-291
)
5

Advertisement

Table of Contents
loading

Table of Contents