Section 10 Asset Optimization Reporting
In the example shown in
the AO Running Time Report folder found under Reports in the Scheduling
Structure.
Figure 82. Saved Reports in Scheduling Structure
To review a printed report:
1.
2.
The report shall be opened in the Microsoft Excel shown in
3BUA000150-600
Figure
Select the completed report according to the date timestamp.
Select the File Viewer Aspect to display the report generated for this time
trigger. The report data can then be reviewed by clicking on the Open button in
the File Download dialog.
Working with Asset Optimization Reports
82, the saved reports are retained as objects under
Figure
83.
183