Installing The Control Unit - Siemens G120P Technical Manual

Variable speed drive
Table of Contents

Advertisement

Installing
5

Installing the Control Unit

5.4 Installing the Control Unit
5.4.1 Installing the Control Unit
40 | 98
Siemens
Building Technologies
Item
Designation
1
Colored ferrite ring
2
Colored ferrite ring
3
Colored ferrite ring
1 x ferrite ring
1 x large cable clamp
4
Colored ferrite ring
5
Colored ferrite ring
2 x ferrite ring
3 x cable ties
Installing the Control Unit on an IP20 Power Module
Proceed as follows to connect Power Module and Control Unit:
Figure 16: Installing Control Unit - IP20
 The Power Module has been correctly mounted (Chapter Installing the Power
Module [➙ 30]).
 The device is de-energized.
1. Locate the lugs at the rear of the Control Unit in the matching recesses of the
Power Module.
2. Mount the Control Unit onto the Power Module so that it audibly snaps into
place.
A5E36496664A_d
2016-03-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents